The operating model had changed. The commercial model had not.

Cost Transformation

The problem

An offshore FPSO operation was carrying a cost base that no longer suited a declining field.

Technical teams at the end client, the contractor and the operator were all reviewing the same issues. Each team was diligent; together they duplicated effort and slowed every decision.

The approach

The commercial and delivery model was redesigned around joint technical teams, drawing on the strongest capability in each organisation. A detailed review of contractor costs also found recurring charges claimed outside contractual entitlement.

The outcome

Annual operating costs fell by £15m. The lower cost base extended the asset’s operating life, protecting hundreds of millions of pounds of future revenue.